Bost Ghana

  • Recommissioning 280km multi-product  pipeline between Accra & Bolgatanga
  • Rigging
  • Hydro testing
  • Rehabilitation of pigging facilities
  • Introduce product
  • Commissioning
  • Refurbishment of 90 km fuel pipeline  between Accra and Akosombo

ROMPCO LOOP LINE CATHODIC PROTECTION

As a specialist sub-contractor, Africore Energy Services successfully completed the project to  performed the following:
  • Cross bonding the existing pipeline to the newly constructed pipeline
  • Design, manufacturing and installation of concrete bunkers at each CP installation point
  • Deep well drilling and installation of anodes
  • CP maintenance during the project execution
  • Logistics to a very remote site

GHANA TAPP PROJECT

  • DCVG Survey
  • PCM Survey
  • Pipeline
  • Construction of a 600m long pipeline underneath a bridge spanning the Volta River
  • Hydro test of entire 90km pipeline
  • CP maintenance during the project execution
  • Recommissioning